A Multi-objective Time-of-use Pricing Optimization Strategy for the Grid with Distributed Photovolta
发布时间:2024-04-29
[1]刘胜佳.分布式光伏发电系统的设计与性能分析[J].科技与创新,2016,20(1):95-96[2]DAIYeming,GAOYan,GAOHongwei,etal.Arealtimepricingschemeconsideringloaduncertaintyandpricecompetitioninsmartg
[1] 刘胜佳. 分布式光伏发电系统的设计与性能分析[J]. 科技与创新, 2016, 20(1): 95-96
[2] DAI Yeming, GAO Yan, GAO Hongwei, et al. A real time pricing scheme considering load uncertainty and price competition in smart grid market[J]. Journal of Industrial and Management Optimization, 2020, 16(2): 777-793
[3] DAI Yeming, LI Lu, ZHAO Pei, et al. Real-time pricing in smart community with constraint from the perspective of advertising game[J/OL]. (2019-04-04). International Transactions on Electrical Energy Systems. http://doi.org/10.1002/2050-7038.12043.
[4] 李陆, 代业明. 广告视角下智能小区实时定价博弈分析研究[J]. 工业工程, 2019, 22(3): 77-85
LI Lu, DAI Yeming. Real-time pricing based on game theory in smart community from advertisement perspective[J]. Industrial Engineering Journal, 2019, 22(3): 77-85
[5] JIANG Jiangfeng, KOU Yu, BIE Zhaohong. Optimal real-time pricing of electricity based on demand response[J]. Energy Procedia, 2019, 159: 304-308
[6] 李春燕, 许中, 马致远. 计及用户需求响应的分时电价优化模型[J]. 电力系统自动化, 2015, 27(3): 11-16
LI Chunyan, XU Zhong, MA Zhiyuan. Optimal time-of-use electricity price considering customer demand response[J]. Proceedings of the CSU-EPSA, 2015, 27(3): 11-16
[7] YANG Shenbo, TIAN Zhongfu, LIN Hongyu, et al. A two-stage optimization model for park integrated energy system operation and benefit allocation considering the effect of time-of-use energy price[J]. Energy, 2020, 195: 117013
[8] ZHOU Kaile, WEI Shuyu, YANG Shanlin. Time-of-use pricing model based on power supply chain for user-side microgrid[J]. Applied Energy, 2019, 248: 35-43
[9] 杨莘博, 谭忠富, 喻小宝, 等. 基于峰谷分时电价的某工业园区多能互补系统多情景运营优化模型[J]. 水电能源科学, 2019, 37(8): 196-201
YANG Shenbo, TAN Zhongfu, YU Xiaobao, et al. Multiple scenarios operation optimization model for park multi-energy complementary system based on peak-valley time-of-use tariff[J]. Water Resources and Power, 2019, 37(8): 196-201
[10] 丁伟, 袁家海, 胡兆光. 基于用户价格响应和满意度的峰谷分时电价决策模型[J]. 电力系统自动化, 2005, 29(20): 14-18
DING Wei, YUAN Jiahai, HU Zhaoguang. Time-of-use price decision model considering users reaction and satisfaction index[J]. Automation of Electric Power Systems, 2005, 29(20): 14-18
[11] 李沐珂, 张靠社. 计及分布式光伏发电的分时电价模型研究[J]. 电网与清洁能源, 2018, 34(4): 74-78
LI Muke, ZHANG Kaoshe. Research on TOU pricing model taking account of distributed photovoltaic generation[J]. Power System and Clean Energy, 2018, 34(4): 74-78
[12] 程瑜, 翟娜娜. 基于用户响应的分时电价时段划分[J]. 电力系统自动化, 2012, 36(9): 42-53
CHENG Yu, ZHAI Nana. Electricity price peak and valley periods division based on customer response[J]. Automation of Electric Power Systems, 2012, 36(9): 42-53
[13] 范文飞, 冯斐, 王德林. 光伏发电接入电网后的分时电价策略研究[J]. 电气开关, 2016(4): 46-54
FAN Wenfei, FENG fei, WANG Delin. Optimal strategy of TOU in power system with integrated photovoltaic power generation[J]. Electric Switchgear, 2016(4): 46-54
[14] 薛云涛, 陈祎超, 李秀文, 等. 基于用户满意度和Ramsey定价理论的峰谷分时阶梯电价联合模型[J]. 电力系统保护与控制, 2008, 46(5): 122-128
XUE Yuntao, CHEN Yichao, LI Xiuwen, et al. Federation model of TOU and ladder price base on customer satisfaction on Ramsey pricing[J]. Power System Protection and Control, 2008, 46(5): 122-128
[15] DEB K, PRATAP A, AGARWAL S, MEYARIVAN T. A fast and elitist multi-objective genetic algorithm: NSGA-Ⅱ[J]. IEEE Trans Evol Comput, 2002, 6(2): 182-197
[16] 周楠, 樊玮, 刘念, 等. 基于需求响应的光伏微网储能系统多目标容量优化配置[J]. 电网技术, 2016, 40(6): 1709-1716
ZHOU Nan, FAN Wei, LIU Nan, et al. Battery storage multi-objective optimization for capacity configuration of PV-based microgrid considering demand response[J]. Power System Technology, 2016, 40(6): 1709-1716
[17] 刘秉祺. 需求侧管理峰谷分时电价多目标优化方法研究[D]. 天津: 天津大学, 2014.
LIU Bingqi. Research on multi-objective TOU pricing optimization method of peak and valley tou price in demand side management[D]. Tianjin: Tianjin University, 2014.
[18] 杨东伟, 赵三珊, 张轶伦, 等. 基于关键指标控制的多目标绿色电力分时定价策略[J]. 工业工程与管理, 2019, 24(2): 38-45
YANG Dongwei, ZHAO Sanshan, ZHANG Yilun, et al. A multi-objective time-of-use green power pricing strategy with key index control[J]. Industrial Engineering and Management, 2019, 24(2): 38-45

平台注册入口